欧美精品在线视频,中文字幕台湾亚洲,可以免费观看一级欧美啪啪,91n免费处女在线破视频+进https://www.fqesyc.

Language:CHINESESENGLISH

Home > News > Preparation for steel structure installation of prefab industrial buildings
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://szcxdj.com.cn

Preparation for steel structure installation of prefab industrial buildings

Time:[2022-3-14]  Hits:2502

With the continuous development of economy, diversified architectural structures have entered our daily life. Develop prefabricated buildings such as prefabricated concrete structure, steel structure and modern wood structure according to local conditions. Steel structure prefabricated buildings are widely used in different types of fields such as industry, commerce, agriculture and so on. The fast installation method is conducive to the rapid completion of the industry and get a good development trend.

The contents and requirements of steel structure installation preparation of prefab industrial buildings are the same as those of ordinary steel structure installation works. During the construction of steel column foundation, the positioning and protection of anchor bolts shall be done well, and the top elevation of foundation and anchor bolts shall be controlled. After foundation construction, inspection and acceptance shall be carried out according to the following contents:

(1) Whether the axis position of each row and column is correct;

(2) Whether the span of each span meets the design requirements;

(3) Whether the elevation of foundation top meets the design requirements;

(4) Whether the position and elevation of anchor bolts meet the design and specification requirements.

Before the hoisting of components, the shape and section geometric dimensions of components shall be inspected according to the relevant provisions in the <<Code for construction and acceptance of steel structure engineering>> and the deviation shall not exceed the value specified in the specification; The components shall be numbered according to the requirements of the design drawings, highlighting the installation center mark. The center mark and elevation mark in two directions shall be popped up for the steel column; Mark the position of binding point; The length of the column should be measured, and the length error should be recorded in detail. It should be written on the plane beside the center mark of the lower part of the column with oil pen, so that it can be adjusted in the two grouting layer of the top elevation of the foundation.

Components entering the construction site must have quality assurance and detailed acceptance records; It shall be stacked in the designated area according to the type, model and installation sequence of components. Enough supporting surface shall be provided for the component stratum skid to prevent the fulcrum from sinking; When components of the same model are stacked, the fulcrum of each layer of components shall be on the same straight line; The deformed components shall be corrected in time and can be installed only after passing the inspection.

Following the contents of the specification, the construction party effectively prepares for installation and provides favorable conditions for the installation of the main steel structure of the prefab industrial buildings. For the construction of steel column foundation, implement the work details and do the work well, which is more conducive to the later installation of steel structure. The normal use of prefab industrial buildings is closely related to the installation preparation. Relevant construction party shall make preparations for the installation of prefab industrial buildings.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
秋霞免费尤物观看| 好大好硬好爽免费视频中文| 午夜男人插进去| 日本乱偷人妻中文字幕| 久久婷婷综合国产精品亚洲| 伊甸园园成人网站入口| www.婷婷基地| 四虎影视国产精品永久免费 | 亚洲日韩精品欧美中文字幕| 国产精品高清网站| 四虎影视2023| 丰满少妇与性猛交| 国产欧美一区二区久久| 色多多国产成人永久免费网站| av综合色国产| 精品宅男在线| 亚洲va久久久噜噜噜久久一| 激情与五月综合| 亚洲综合无码一区二区三区伊人| 无码中文幕国产精品| 五月天婷婷狠操综合网| 99热亚洲| 国产成人精品女人不卡在线| 99热免费观看| 狠狠干狠狠操狠狠插| 亚州在线视频精品人人干人人摸| 人人澡人人爽人人妻免费| 91精品亚洲| 97干超碰| 精品无码一区二区三区色噜噜| 色网站| 性后入日韩| 亚洲人妻精彩久久久| 欧美亚洲日韩精品一卡| 亚洲你懂的| 天天天干夜夜操| 喷潮视频一区二区三区| 久久亚洲天堂| 拉人免踢永久看毛片| 国产男女爽爽爽免费视频| 免费以及少妇毛片久久久|