欧美精品在线视频,中文字幕台湾亚洲,可以免费观看一级欧美啪啪,91n免费处女在线破视频+进https://www.fqesyc.

Language:CHINESESENGLISH

Home > News > Importance of structural design of multi-storey prefabricated workshop building
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://szcxdj.com.cn

Importance of structural design of multi-storey prefabricated workshop building

Time:[2022-4-29]  Hits:2462

In recent years, with the development of the diversity of the world economy, the industrial production of various countries and regions has also been continuously improved, and the complexity of the process layout is a revolutionary change for the industrial workshop buildings with single production function and simple building layout in the past; At the same time, the popularization of computers and the integration and simplification of structural calculation software have solved the complex and cumbersome structural calculation problems. As a result, multi-storey and even high-rise productive industrial buildings with large span, large space and complex building layout have emerged. Under the background of such rapid development, the rational selection of building structure layout and design parameters has played an important role in structural design.

1. Characteristics of multi-storey prefabricated workshop building

1.1 plane structure layout and column grid layout

In the plane layout of multi-storey prefabricated workshop building, usually in order to meet the process requirements: the structural layout is irregular, the pole network is irregular, and the beam layout is irregular, so there is the phenomenon of opening holes on the main stressed components according to the process requirements. At the same time, the internal space of the workshop building is generally large, and the column spacing is mostly 6 ~ 12m; The same part has the design of pulling column; The column spacing will increase to more than 18m. This makes the force transmission of the structure complex, the force is not clear, and the phenomenon of stress concentration is easy to occur in the design.

1.2 vertical structure layout and floor height

The storey height of multi-storey prefabricated workshop building is large, which can reach 4 ~ 8m, and there are often staggered floors and interlayer in the vertical layout, and large holes are opened in the floor, which makes the floor unable to provide sufficient in-plane stiffness, and the effective mass of the structure is unevenly distributed along the vertical direction. Under the action of earthquake, the structure may produce "short column effect", which makes the horizontal shear force of local column section become the control factor of section design.

1.3 various types of loads

The concentrated load of industrial workshop building mainly includes the self weight of equipment, and sometimes the vibration disturbance of equipment needs to be considered, and the dynamic calculation is carried out according to the requirements of the specification. Suspension load mainly includes pipeline load and crane load, and sometimes the pipeline also produces horizontal load and bending moment. The plate surface load is mainly based on the requirements of production technology. There are different values of live load on the ground of different production buildings, but this kind of live load is generally greater than that in civil buildings.


1.4 floor and foundation form

The cast-in-situ reinforced concrete floor is generally adopted for the floor of industrial workshop building. However, due to the equipment load requirements proposed by the process, the floor may have holes or local thickness changes. The foundation form of the powerhouse mostly adopts the independent foundation under the column and the strip foundation under the column. If the bearing capacity of the foundation is low, the lime soil compaction pile, sand pile and other methods can be used to deal with it, or the cast-in-place pile can be used to act directly on the hard soil layer.

1.5 light envelope

Generally, the enclosure structure of industrial workshop building is not used as a load-bearing system, and light materials are usually used. The roof structure mostly adopts steel truss purlin system with light insulation layer. This light enclosure material is beneficial to reduce the self weight of the structure and reduce the seismic response.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
国产freesexvideos性中国| 婷婷色综合色| 日本XXXXX视频| 国产精品爆乳奶水无码视频免费| 在线超碰观看互动交流| 国产精品特级AAAAAAA| 精品久久久久无码一区| 亚州无码精品专区人妻| 亚洲精品五区三区在线观看 | 色播男人的天堂| 天堂呦呦在线观看视频| 国产亚洲无码国产精品| 欧美激情五月天视频| 中文国产精品精品成人无码精品 | 国产AV肥熟乱| 少妇特黄A一区二区三区 | 欧美啪啪视频一区二区三区| 久久AV有码| 中文字幕大屁股| 精品久久综合1区2区3区激情| 美足美腿图集国产一区| 在线观看片免费人成视频无码| 中文亚洲精品无码| 精品国产99久久久久久| 国产成人盗拍精品免费视频| 亚洲无码一二三区| #成人99| 91亚洲精品第一| 欧美天堂精品在线| 亚洲AV性色在线播放| 在线美欧| 玩弄中文字幕无码人妻| 亚洲日韩AV无码| 伊人久久大香线蕉网精品| 欧美a级视频| 日本二区亚洲中文| 日本欧美中文字幕| 天堂成人精品网站| 亚洲视频精品一区二区| 女同东京热| 欧美在线性中文字幕在线色|