欧美精品在线视频,中文字幕台湾亚洲,可以免费观看一级欧美啪啪,91n免费处女在线破视频+进https://www.fqesyc.

Language:CHINESESENGLISH

Home > News > Mixed steel installation drawings and design changes
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://szcxdj.com.cn

Mixed steel installation drawings and design changes

Time:[2014-9-27]  Hits:5226

        Drawings should be carried out before the installation of steel joint hearing before the joint hearing of construction units should be familiar with and master design file contents, find the component mounting problems affecting the design and review with other professional engineering with inappropriate ways.
  
1 drawing Mixed

Before installation of steel structures, construction units in order to solve problems in a familiar drawing found during the technical problems and quality problems found in the drawings nipped in the bud, the parties participating in the construction drawings to conduct joint hearing.
Mixed content drawings generally include:
Qualification (a) meets the design units, drawings, whether by design unit officially signed.
(2) design units to do the design intent description and proposed process requirements, the main production unit introduces steel production process.
Have a contradiction between (3) professional drawings.
(4) between each drawing plane position, elevation, etc. are the same, mark whether the omission.
(5) the professional construction and construction procedures with or without problems.
Construction methods (6) Install the unit can meet the design requirements.

2 design changes

In the construction drawings before use, after use of design changes will occur due to the construction unit requirements, or changes in construction site conditions, or changes in national policies and regulations and other reasons caused. Design change for whatever reason, who proposed the construction unit must obtain the written consent and apply the change. There will schedule and cost impact of design changes, in strict accordance with the regulations should be implemented in order to clarify responsibilities and avoid claims event is not conducive to the construction.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
国产成人亚洲精品无码青青草原| 伊人久久影院| 国产日本亚州| 欧美精品65| 国产精品午夜久久久久久99热| 亚洲欧洲天堂自拍视频| 高清无码免费导航| 肥臀二三区| 抽插视频网站| 开心婷婷在线综合| 国产亚洲精品综| 国产精品第49页| 日韩少妇高潮喷水| 任你躁久久久久久老妇| 久久天天躁狠狠躁夜夜躁| 乱码三级片| 丝袜激情91| 久久久久亚洲Av无码专区桃色r| 色欲午夜无码久久| 男人的东京热| 五月丁香久久| 日本无遮羞肉体动漫在线观看| 91欧美精品熟妇| 在线视频99思思| 天堂网AVcom| 高潮精品久久| 天天躁日日躁狠狠很躁| 五月天人成网站| WWWW精品国产四虎影院| 在线观看国产亚洲欧洲精品| 亚洲黄色成年人| 国产一级肉射| 国产suv精品一区二区68| 久久特黄色片| 成熟的水蜜桃2法国| 国产AV夜夜欢一区二区三区| 日韩不卡免费| 东京热VIP999| 一级看片免费视频囗交| 亚洲日韩在线人妻| 一个色的综合网|