欧美精品在线视频,中文字幕台湾亚洲,可以免费观看一级欧美啪啪,91n免费处女在线破视频+进https://www.fqesyc.

Language:CHINESESENGLISH

Home > News > 1. Steel parts and steel components processing requirements
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://szcxdj.com.cn

1. Steel parts and steel components processing requirements

Time:[2015-2-28]  Hits:4868

1. Steel parts and steel components processing requirements:
  Cutting surface or cut surface of steel, should be no cracks, slag, stratification and greater than 1 mm of missing edge, should fully checked.
Carbon structural steel at ambient temperature is below -16 ℃, low-alloy structural steel at ambient temperature is below -12 ℃, not cold cold bending and straightening.
Steel surface after the correction, there should be a clear concave or damage, scratches depth of not more than 0.5mm, and should not be greater than the thickness of the steel allows negative deviation 1/2.

2. Steel welding requirements:
  (1) Welder
  Engaged in steel welders welding work must obtain a certificate and pass the examination. Welders welding must pass the examination within its scope the project and recognized.
  (2) Non-destructive testing
  Design requirements for full penetration of the primary and secondary weld ultrasonic testing should be used to check the internal defects, ultrasonic testing can not judge when the defect should be used radiographic inspection, and testing its internal defect classification methods should be consistent with existing national standards regulations.


3. Fasteners Requirements:
  Steel production and installation of units should be required strength bolts were even anti-slip friction coefficient test and retest the surface, the friction surfaces of the scene should be a separate component for anti-slip coefficient test results should meet the design requirements.


4. Steel and steel component assembly installation requirements:
  (1) H-beam flange plate welded seam and web seam spacing of not less than 200 mm.
  (2) cranes and crane girder trusses in place after installation should not be under the scratch.
  (3) multi-section column installation, locate the axis of each section of the column should be drawn directly on the ground to control the axis, the axis must not lead from the lower column, to avoid excessive accumulation of errors.
  (4) After completion of the steel truss structure and the overall fight after completion of the roof should be separately measured deflection, deflection, and the measured value shall not exceed 1.15 times the corresponding design values.
  (5) paint, painting several times, coating thickness shall meet the design requirements.
  (6) a thin coating fireproof paint coating thickness shall comply with the relevant requirements of the fire resistance design.


5. Steel Division project completion and acceptance requirements.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
国产亚洲精品第一综合不卡| 亚洲少妇aaa| 亚洲熟妇少妇任你躁在线观看| 久久精品一区二区三区资源网| 日韩AA免费看| 99riAV无码国产在线看不卡| 亚洲欧美蜜芽tv在线一区| 色哟哟免费视频| 亚洲国产人妖一区二区| 狂野欧美XXXX韩国少妇| 淫乱的一级毛片| 国产精品蜜殿久久| 色悠悠在线视频网站| 老鸭窝亚洲欧美国产日韩在线| 激情播播在线| 亚洲av永久无码精品主页| 亚洲Av无码乱码国产| 欧美怡红院久久| 天美传媒麻豆0073| 亚洲欧美一区二区精品| 精品在线你懂得| 久久久久国产线看观看精品| 欧美少妇喷水| 香港片三级片一区二区| 国产日韩久久久久无码精品| 日韩一二三级免费电影| 久久国自产拍偷拍精品| 对白脏话肉麻粗话AV| 亚洲AVAV天堂Av在线精品一区二区| 亚洲 免费 色| 思思这里只有精品视频| 国产精品久久黄片| 亚洲第一在线观看国产| 人妻29p| 欧美精品欧美人与动人物牲交 | 欧美婷婷丝袜换个| 在线看片人成免费无遮挡 | www.色狠狠综合网| 色.www| 国产成人一区二区三| 中文字幕亚洲综合小综合在线|