欧美精品在线视频,中文字幕台湾亚洲,可以免费观看一级欧美啪啪,91n免费处女在线破视频+进https://www.fqesyc.

Language:CHINESESENGLISH

Home > News > raw materials and finished steel structure approach
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://szcxdj.com.cn

raw materials and finished steel structure approach

Time:[2016-1-23]  Hits:4881

Guangzhou Steel tells you: raw materials and finished steel structure approach

(1) Guangzhou Steel Engineering steel materials used should be consistent with the design documents and the relevant existing standards, and have quality certification document, the admission after passing inspection before using.
(2) site acceptance steel, in addition to compliance with "Steel construction norms" gb50755-2012, there should be consistent with existing national standards "Steel Construction Quality Acceptance" gb50205-2001 of. Belonging to one of the following steel, should be carried out in full retest sampling:
① foreign steel imports;
② mixed batch of steel;
③ thickness equal to or greater than 40mm, and the design of the performance requirements z slab;
④ safety rating for a building structure, large span steel structure, the main force of the steel components used;
⑤ steel retest design requirements;
⑥ doubt on the quality of steel.
(3) the requirements of the steel sheet in the thickness direction, z15 grade steel for each inspection lot by the same brand, the same heat, the same thickness, the same delivery shaped steel plates, each batch weighing not more than 25t; z25, z35 grade steel sheet by sheet reinspection.
Standards (4) steel imports reinspection sampling, sample preparation and test methods shall design documents and contract execution. Customs inspection results should be approved by the supervising engineer, later recognized as an effective material retest results.
Welding materials (5) for important welds, or welding material quality certificate document is doubt, should be sampled retest, retest when the wire should press five batches (quite furnace batch) to take a series of tests, the electrode It should be in three batches (quite furnace batch) to take a series of tests.
(6) ordinary bolts as a permanent attachment bolts, when the design document or its quality is doubtful, should be a minimum tensile load bolt physical reinspection, when reinspection each size bolt checks 8.
(7) High strength large hexagon head bolts connecting deputy and torsional shear bolts connecting deputy should each have a torque coefficient and tight coaxial force (Pretension) factory qualified inspection reports, and comes with the box. When the bolts connecting deputy storage time more than six months after use, the relevant requirements should be re-torque coefficient or fastening shaft force test, qualified before use.
(8) high-intensity large hexagonal bolts connecting deputy and torsional shear bolts connecting deputy should individually tightening torque and axial force coefficient (Pretension) reinspection, the test bolt construction bolt batch should be installed on-site at random, 8 sets of connections made each batch extraction retest.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
www.无码久久| 国产精品国产精品亚洲专区无码| 国产又黄又大又猛又爽的在线观看| 91丨精品丨国产丨| 欧美亚洲国产大片在线播放| 亚洲综合精品视频| 日韩图片亚洲综合专区| 亚洲天堂无码高清性视频| 久久精品电影| 黑人巨大精品欧美一区二区免费| 91人妻人人澡人人精品| 你懂得一区二区在线| 欧美精品自拍第一页| 亚洲AV片高清资源在线观看| 亚洲人成人久久| 欧美亚洲自拍一区| 丁香六月深爱五月| 久久久av操| 亚洲涩涩一区二区| 视频一区二区免费| 亚洲欧美日韩在线www| 国产性情无码在线| 国产产无码乱码精品久久鸭| 欧美日韩中文色| 久久综合日韩无码| 国产青青草原| 中文字幕精品区| 亚洲国产精品久久精品成人| 91天天干夜夜| 色导航色中色| 日韩一区小视频| 国内免费AV网站在线观看| 91麻豆视频福利| 日韩制服中文第一页| 里番纯肉侵犯全彩无码| 精品欧美成人高清视频在线观看 | 黄Av永久网站| 人妻欧美精品片在线97| 亚洲欧美熟妇另类| 日本三级97| 激情四射五月天色婷婷|