Foshan main steel members (b)

Time:[2016-5-14]  Hits:5255

welding
(1), the general requirements
a welder required certificates.
c welding, flux before use technical specifications shall be specified baking temperature baking.
c welding welder should be reviewed before the handling member joint quality and pads, if not meet the requirements, in order to be qualified welding after trimming.
(2) the welding process
a Before welding, construction workers assessed according to the process of compilation of the welding process instructions, specific guidance welder welding work.
b raining or snowing non-open-air welding.
c positioning welders should have Welder certification, welding materials used should tack welding and welding materials the same official, tack welding may not have pores, cracks, slag and other defects.
d same position should not exceed twice the number of weld repair.
(3), H-beam welding
All members of the project H-beam welding using LMZ-1500 automatic gantry welding machine, automatic submerged arc welding, gas shielded welding machine welding, to avoid weld, slag, weld defects.


test
(1) After completion of the processing member, in accordance with the processing map and (GB50205-2001) of the relevant provisions into acceptance.
(2), member acceptance criteria for the acceptance of construction quality of steel structures (GB50205-2001) and construction drawings.

Painting, NO
(1), the general requirements
a member rust and paint work should be carried out after the quality inspection qualified member.
b Painting Lobe coating construction personnel professional training, after familiar with the performance of coatings and coating job essentials, before construction.
(2), the management coatings
A variety of coating materials of different specifications should meet the design requirements.
b component coating technology used must comply with the conditions of professional standards, and product certification. Over use of custody of the paint should be re-inspection, qualified before use.

Factory
Lifting member according to plan will be qualified batches packaged, transported to the site.

Admission preparation
(1), construction workers and related personnel arrived at the construction site preparation work before installation.
(2), the former construction workers were entering education, quality, duration, safety and other aspects of the work to fully implement the team, for all the difficulties of design drawings, construction program, focusing on a comprehensive understanding.
(3), with the Party-site tests, such as raw materials, components, and equipment disposal site access road, water, electricity, housing, construction coordination and determine the amount of each process and construction plans, and other construction units Cross Operations Coordination plan.
(4) of the construction process (base buried and associated facilities) for review, to ensure the quality of embedded parts, elevation, the central axis, geometry, parallel degree correct. Do the handover procedures.
(5), according to the requirements of the steel works, ready to upgrade machinery, equipment, tools, materials planning and special tools; equipment to do the preparatory work and auxiliary materials, such as cranes, welding machines, measuring instruments, hand tools and other aids , implement vertical transport conditions.
(6), inspection and acceptance steel components positioning axis, elevation, and make the steel member installation guides actinomycetes work;
(7), is responsible for the installation of steel components transport lifting, positioning, calibration, fastening bolt, seam welding installation work;
(8), according to the actual situation of the construction work planned to make necessary adjustments and additions and submitted to the project manager for approval.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
欧美片 网站免费| 色日韩小说影院| 品三区 精品四区| 久久综合婷婷丁香五月中文字幕| 日本大奶乳久久| 伊人久久大香线蕉| 欧洲亚洲第一页在线观看| AV卡通中文字幕| 日韩大陆在线观看| 欧美中文人妻| 日韩AV无码一区二区三区四区 | 国产精品欧美综合第一区| 久久精品视频不卡| 欧洲亚洲综合一区二区三区| 油尖旺区| 日本一区二区18| 亚洲精品无码av天堂| 精品人妻AⅤ大牛影视| 久久久亚洲精品伦| 精品久久人人妻人人做精品| 91系列国产精品| 全免费A肛交| 又大又粗午夜视频免费观看| 最新精品国产免费| 国产AV乱码一区二区三区无卡顿 | 色秀视频在线观看亚洲| 亚洲人成无码网站18禁| 国产自国产自愉自愉免费24区| 伊人久久大香线蕉av五月天 | 97人人爱| 久久久久久中文字幕无码| sbyyyy色播| 高清无码视频一区| 欧美色图亚洲电影在线| 久久精品无码一区二区无码性色| 在线免费观看涩涩视频| 免费A级人成a大片在线观看| 无码午夜AV| 色婷婷波多野结衣| a在线亚洲男人的天堂试看| 六月婷激情|