Foshan three steel steel truss construction method

Time:[2016-6-11]  Hits:4934

A high-altitude assembly method
Steel truss assembly method by high-altitude installation, erection is first assembled bracket design position, and then use a crane to grid member sub-element (or block) to the design position hanging in the air, were assembled on the bracket. Sometimes this method does not need large-scale lifting equipment, but the bracket assembly large amount of aerial work more. Therefore, the high strength for steel pipe truss with steel production of steel truss or bolt ball node is more appropriate, there are still a number of steel truss construction method has been applied.

Second, the overall installation method
Overall installation method is to first grid on the ground assembled into a whole, and then lifting equipment designed to enhance its overall position to be fixed. This method of construction without assembling the bracket tall, aerial less easy to ensure the welding quality, but requires a large crane lifting equipment, technology is more complex. Therefore, this method of spherical joints steel grid (especially three-grid and other bars more grid) is more appropriate. Depending on the equipment used, the overall installation method is divided into multi-machine Hoisting method, pull the lever to enhance the law, law and jack lifting jack lifting method.

Third, the high-altitude sliding method
In recent years, the use of aerial roof truss construction by parallel sliding gradually increased, it is especially suitable for theaters, auditoriums and other projects. This method of construction, the grid assembly platforms are situated in the building lobby top plate assembly (erection can be assembled on the platform assembly auditorium bleachers), to be the first assembly unit (or first stage) assembly is completed, it is about to fall on the sliding track, traction equipment from sliding forward a certain distance. Then assembled on the platform of the second assembly units (or second), after a good fight, together with the first assembly unit (or first stage) with slip forward, so ask before slipping constantly assembled piecemeal, until the entire grid assembly is completed and moved to place the slide position.

Good slip assembly grid, the grid can be set up under the carriage wheel, the roller slide on the slide rail; also in the grid holder under the seat bottom, so embedded in the bearing plate along the reinforced concrete frame beam embedded steel slide.
Slip grid or lever hoist winch available traction. According to the lever bearing capacity and traction grid size between supports, may be one or more points of traction. When the grid slip ends sync value should not exceed 50mm.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
狼友av永久网站免费极品在线观看| 日本久久精品综合| 四虎电影在线观看| 久久国产精品日本波多野结衣| 在线色电影网站| 亚洲4区欧洲色3区| 另类亚洲欧洲| 浪潮av丰满熟妇无码天堂| 欧美在线一二三区| 精品无码一区二区三区在线视频 | 亚洲AⅤ精品一区二区三区不卡| 日韩在线中文字幕av| 无码精品一区二区三区大桥未久| 久久青青爱www| 亚洲日韩一级精品片在线观看| 亚洲中文中幕无码专区| 久热久热精品| 日韩人妻av网址| 欧美,国产,日韩,另类| 久久久精品一区=区| 日韩精品黄片免费| 日韩欧美麻豆久久| 中文字幕无码久久精品| 麻豆a一区| 天堂A∨在线| 另类欧美变态一区二区三区| 天天躁日日躁久久| 欧美日韩在线亚洲二区综二| 涩爱Av涩爱| 中文17久久久久久久久久久| 无码潮喷一区二区三区| 亚洲一区五码视频| 苍井空张开腿实干12次| 超碰人人在线| 中文欧美国产精品| 人妻蜜と1~4动漫中文字幕| 午夜无遮挡| 看激情一级影视频| 精品国产污污免费网站入口| 一级黄色毛片极品| 奇米四色AV一区二区|