Project cost control for wholesale metal building systems

Time:[2020-10-24]  Hits:3337

Different structural systems, peace, and facade layout have obvious effects on the project cost. In the design stage, only by determining the reasonable layout and facade layout and structural system according to the functional requirements of the building can the project cost be effectively controlled and economically applicable.

 

 

The design of the steel structure of the portal frame steel structure also has the economic span and the optimal spacing of the frame. When the process requirements allow, it is more economical to choose a small-span portal frame. Under normal circumstances, the optimal spacing of portal frames is 6m-9m. When large-tonnage cranes are installed, the economical column spacing is generally 7m-9m. It should not exceed 9m. When it exceeds 9m, roof purlins, crane beams and wall frames The amount of steel used in the system will increase accordingly, and the cost is not economical.

 

 

In the multi- and high-rise steel structures, the engineering volume of the floor structure system occupies a large proportion, which has an important influence on the work performance and cost of the structure. When determining the floor structure plan, the main consideration is to ensure that the floor slab has sufficient plane overall rigidity, which can reduce the weight of the structure and reduce the height of the structure layer, which is conducive to convenient on-site installation and rapid construction, and better fire protection and sound insulation Performance, and easy to lay the pipeline. Common floor slab practices include: profiled steel plate composite floor slab, prefabricated floor slab, laminated floor slab and ordinary cast-in-place reinforced concrete floor slab. At present, the most commonly used methods are profiled steel composite floor slabs and ordinary cast-in-place reinforced concrete slabs. When using these two methods, considering the combination of cast-in-situ slab and steel beam to form a combined beam that bears the common force, the height of the steel beam can be effectively reduced and more steel can be saved.

 

 

In the high-rise steel structure, the frame column adopts the circular steel tube concrete column, and the beams and slabs adopt the steel-concrete composite structure. The total steel consumption is greatly reduced compared with the ordinary steel structure, which can effectively reduce the project cost.

 

The advantages of steel structure construction determine that it will have strong vitality. In the design stage, technological innovation, material selection, and design optimization are the key stages for controlling construction costs and promoting the industrialization of building steel structures.

 

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
四虎综合在线| 99久久亚洲精品美女| 午夜看A级毛片| 国产成人精品白浆免费网站| 超碰97免费上传公开| 欧美国产第| 亚洲Av片久久综合网。| 午夜免费在线观看| 日本熟妇色XXXXX日本免费看| 亚洲日韩精品成人无码AV| 成人aaa免费视频在线直播| 久久av无码综合色| 亚洲性无码av中文字幕cn| 日本欧美大码a在线观看| 国产激情久久久久久熟女老人 | 偷窥高清无码| 在线无码国产精品| 国产喷潮视频在线播放| 国产偷自拍| 巨大黑人极品VIDEOS精品| 亚洲超熟妇| 亚洲酒色网| 国产成人啪精品视频网站| AV短片久久| 一级毛片亚欧中| 久久婷婷色香五月综合缴缴情| 欧美激情网站| 你懂得网站有没有| 亚洲一区二区三区精品视频在线| 亚洲一二三区在线| 久久久久亚洲精品天堂久久久久久| 人人妻人人97| 亚洲精品www久久久久久| 岛国精品一区二区三区不卡| 91精品国产福利在线导航| 色婷婷六月天在线观看| 精品亚洲国产成人AV在线小说 | 欧美老熟妇欲乱高清视频,| 亚洲小说无码| 久久免费视频偷拍| 西西4444WWW大胆无码|