欧美精品在线视频,中文字幕台湾亚洲,可以免费观看一级欧美啪啪,91n免费处女在线破视频+进https://www.fqesyc.

Language:CHINESESENGLISH

Home > News > Common problems of Foshan steel structure column base installation
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://szcxdj.com.cn

Common problems of Foshan steel structure column base installation

Time:[2021-4-7]  Hits:3113

Installation of column base

 

(1) Embedded parts (anchor bolt) problems: overall or layout deviation; elevation error; screw thread without protective measures. The bolt holes on the bottom plate of the steel column are directly out of alignment, resulting in insufficient thread length.

 

Measures: the steel structure construction unit cooperates with the civil construction unit to complete the embedded parts work, before the concrete pouring and tamping. Relevant dimensions must be rechecked and fixed firmly.

 

(2) The phenomenon of anchor bolt not vertical: the horizontal degree of the base plate of frame column column foot is poor, the anchor bolt is not vertical, and the horizontal error of embedded anchor bolt is too large after foundation construction. The columns are not in a straight line after installation, which makes the appearance of the house difficult to see, brings errors to the steel column installation, and affects the structural stress, which does not meet the requirements of the construction acceptance specification.

 

Measures: the anchor bolt installation should adhere to the bottom plate leveling with the lower adjustment bolt, and then the secondary grouting of non shrinkage mortar, and the construction method abroad. Therefore, during the construction of anchor bolt, steel bar or angle steel can be used to fix anchor bolt. Welding into a cage, improving the support, or taking some other effective measures to avoid the anchor bolt moving one place when pouring the foundation concrete.

 

(3) Anchor bolt connection problems: the anchor bolt of column base is not tightened, the base plate is not welded with the bottom plate; some anchor bolts with 2-3 threads are not exposed.

 

Measures: Welding bolts and nuts shall be adopted; outside chemical anchor bolts, fire-proof coating and heat insulation treatment shall be added to prevent the anchorage performance from being affected by fire; observation data of foundation settlement shall be supplemented.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
精品五月丁香av| 久久亚洲精品风间由美| 欧美精品黄色二级大片| 国产一区二区三区亚洲欧美| 亚洲一本无码| 亚洲九九网| 亚洲国产日韩在线| 小sao货水好多真紧h无码视频 | 久久伊人精品视频| 久久久国产精品无码一区 | 精品久久久久久久久免费蜜桃| 啄木系列成人AV电影| 国产九九av| 午夜裸体视频tv| 高清无码电影| 亚洲日中色产av| 国产精品夜色视频久久| 国产成人免费AⅤ久久| 爆乳少妇高清无码区| 夜夜操天天添| 激情亚洲欧美网| 久久综合九色综合欧美久久久| 91人妻人人澡人人爽人人精品′ | 97人人干| 国产精品激情无码视频| 亚洲欧美一区二区三区在线观看| 狠狠色综合久久| 国产精品入口swag| 精品午夜无码| 久久精品视频免费黄片99| 一级毛片免费网站播放| 久碰综合| 中字幕久久久人妻| 国产三级无码内射在线看| 激情五综合五月激情| 中文久久区| 欧美人的天堂一区二区三区| 精品一区二区久久久久久无码小说| 国产线路一伊人久久| 人妻中字AV| 精品露脸国产偷人在视频|