Analysis of key construction points of steel column and frame beam of high-rise steel structure

Time:[2021-8-25]  Hits:2498

Analysis of key construction points of steel column and frame beam of high-rise steel structure

1、 Analysis on key points of steel column construction of high-rise steel structure

Steel column is a vertical component that determines the floor height and the total height of the building, and its fabrication and processing needs to meet the corresponding specifications and standards. At the same time, the shrinkage deformation of the weld and the compression deformation caused by the vertical load need to be considered in the process of turning and blanking. Therefore, the turning and blanking length of the steel column is not equal to the design length, even if it is only a few millimeters, it can not be ignored. Moreover, when the sections of the upper and lower steel columns are completely equal, they are not allowed to be interchanged. It is required that each steel column shall be numbered differently and installed in place correctly. The welding of stiffener plate in rectangular or square steel column shall adopt nozzle electroslag welding according to the requirements of current specifications, and other forms such as opening on box plate and slot plug welding are not allowed.

2、 Analysis on key construction points of high-rise steel structure frame beam

In order to ensure that the joint area at the connection between the frame beam and the steel column has good ductility, connection reliability and floor height accuracy, during factory manufacturing, a cantilever beam (short corbel) is set at the position where the frame beam is located. The connection between the upper and lower flanges of the cantilever beam and the steel column adopts cut penetration weld, and the web adopts fillet weld. The frame beam is connected with the cantilever beam (short corbel) of the steel column, the upper and lower flanges are connected by the full penetration weld of the lining plate (also the arc striking plate), and the web is connected by high-strength bolts. Since the allowable deviation of reinforced concrete construction is far greater than the accuracy requirements of steel structure, when the frame beam is connected with reinforced concrete shear wall or reinforced concrete cylinder wall, the connecting plate of web can be opened with elliptical holes, which shall meet the requirements of hole edge distance. The blanking length of frame beam is also not equal to the design length, and the welding shrinkage deformation shall be considered. The welding shrinkage deformation can be calculated by empirical formula, and then checked according to the actual processing, so as to determine the exact length of the turning and blanking. High strength bolt connection or welding connection can be adopted for the connection of the upper and lower flanges of the frame beam. At present, most of them adopt full penetration welding connection with lining plate. During construction, the lower flange shall be welded first, and then the upper flange shall be welded. One end shall be spot welded for positioning, and then the other end shall be welded. The web is connected with high-strength bolts. It is necessary to fully understand whether friction type or pressure bearing type high-strength bolts are used in the design. The friction coefficient of friction type high-strength bolt should be selected reasonably. When using high-strength bolt group connection, the accuracy of hole position is very important. At present, template drilling and multi axis NC drilling are generally used for hole making. The former has low precision and the latter has high precision, so the latter should be given priority. When the formwork is used to make holes, the accuracy of the formwork shall be ensured to ensure the accuracy requirements of the assembly holes of high-strength bolts and site installation holes. In case of local deviation of hole position, reaming with reamer is only allowed. It is strictly prohibited to use gas cutting for hole expansion. If gas cutting is used for hole expansion, it shall be handled as a major quality accident.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
俺去五月天操逼| 国产XXXXX片免费观看| 国产不卡精品在线| 国产激情一区二区三区| 精品久久久久久妇女自卫喷水| 同性恋一区二区| 日韩国产亚洲欧美嫩色| 午夜神马在线无码| 精品久久久久久无码中文野结衣| 日韩精品欧美激情国产一区| 高无码国产精品| 少妇精彩一区二区| 色五月婷婷丁香久久| 超碰97人人射| 人人妻人人澡人人爽精品欧美一区| 人人操人人人人精品| 美女在线91| 欧美精品国产一区| 大学生免费一a级片| 婷婷丁香五月综合色| 高清无码毛片| 五月丁香六月中文字幕| 人妻狠狠躁夜夜躁天天躁网站 | 先铮av无码资源| 久久国产精品免费99| 免费自慰网日本不卡| 美国黄色大片儿一区2区免费看| 在线亚洲精品无码中文字幕| 亚洲天天久久中文字幕精品| AV在线大片不卡可观看| 免费精品国产自产拍在线观看图片| 91综合视频在线观看| 人妻少妇精品专区性色AV| 日韩精品一区二区三区中文字幕| 国产综合一区二区在线观看| 欧美国产在线精品| 久久无码国产成人电影| 国产成年无码久久久久下载| 91人人做人人爱免费在线观看等 | 九九少妇xxxxxx| 中文字幕日韩精品欧美|