欧美精品在线视频,中文字幕台湾亚洲,可以免费观看一级欧美啪啪,91n免费处女在线破视频+进https://www.fqesyc.

Language:CHINESESENGLISH

Home > News > During the installation of steel structure, the following problems shall be paid attention to:
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://szcxdj.com.cn

During the installation of steel structure, the following problems shall be paid attention to:

Time:[2021-8-28]  Hits:2738

During the installation of steel structure, the following problems shall be paid attention to:

1. Before the installation of steel structure, all members shall be comprehensively inspected, such as whether the number, length, perpendicularity of members and the size between bolt holes at installation nodes meet the design requirements; The defects generated during fabrication and deformation generated during transportation shall be corrected on the ground and properly solved.

2. The steel column and foundation are generally connected by embedded anchor bolts. Therefore, before installing the steel column, check the size between the column base bolts, whether the length exposed to the foundation surface, the elevation of the foundation top meet the design requirements, and whether the thread of the column base anchor bolt is damaged (generally, measures are taken during foundation construction to protect the column base anchor bolt and its thread from being damaged).

3. When hoisting the steel structure, proper measures shall be taken to prevent excessive bending and torsion deformation. The contact part between the rope buckle and the component shall be padded with cushion blocks to prevent the component from being damaged.

4. After the steel structure is hoisted in place, the support and other connecting members shall be fastened in time to ensure the stability of the structure.

5. The hoisting of all superstructure can only be carried out after the substructure is in place, corrected and fastened with supporting members.

6. Assemble a large installation unit on the ground according to the lifting capacity of the site installation machinery to reduce the workload of high-altitude operation.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
欧美日韩国产不卡| 国产免费淫秽视频| 免费无码又爽又刺激又污又黄| 曰本女色视频| 国产亚洲天堂无码| 亚洲国产精品久久无码大尺| 免费无码在线观看国产不| 国产成人动作片| 狠狠躁天天躁日日躁欧美| 欧美黄日韩亚洲老女人| 北岛玲视频下载| a鈥唙77777| 亚洲日韩社区一区二区三区| 欧美午夜不卡在线| 欧美A级超大胆视频| 亚洲成人小电影一区| 奇米网一区二区的| 日韩毛片在家看| 国产v亚洲v天堂a无码| 国产在线草莓AⅤ精品| 国产欧美日韩综合精| 午夜国产一区二区三区| 最新国产精品精品视频| 国产视频无码| 变态另类高清无码| 亚洲日韩欧美综合色另类小说 | 日韩免费性视| 亚洲ΑV在线精品糸列| 玖日韩| 亚洲成人国产精品午夜福利| xxav视频| 精品无码一区二区视频在线| 国产在线精品区二区不| 国产传媒三级在线| 国产精品亚欧美一区二区三区| 一品道高清无码一区二区在线视频 | 成人无码专区| 亚洲福利avx8| 亚洲色图婷婷18p| 中文字幕精品久久久久人妻 | 丝袜自慰一区二区三区|