Steel structure warehouse hoisting process and hoisting plan-Chapter 1

Time:[2021-9-25]  Hits:2823

Hoisting process

 

Positioning --- Calibration Height --- Column Top Bolt Embedded --- Calibration Height - Elastic Line - Column Installation - Steel Beam Installation - Secondary Structure Installation --- --Welding----Repainting----Completion

 

 

Steel column installation process


A,Lifting of steel columns

 

1.Re-test the foundation, including the exposed length of the anchor bolt, the displacement deviation of the anchor bolt center line to the reference line, the distance between the anchor bolts, and the foundation elevation. The unqualified ones can be handled before lifting.

 

2.In order to control the installation elevation of the column, a 500mm position is also marked on the visible cross section of the column in advance for fine-tuning and correction of the elevation during installation. Install the steel column on the basis of qualified retest, first tie the column with a single steel wire rope, and choose the position of the lifting point at a position 1/3 of the length of the column from the end of the column. The column is lifted by the rotation method, and the steel column is lifted and sent to the installation position. The lashing place should be padded.

 

 

B, the correction of the steel column

 

1.Draw the center line in advance on the visible surface of the column, and then use the theodolite to adjust the verticality of the column in two mutually perpendicular directions.

 

2.Control the verticality of the column by measuring the distance between the inner side of the column and the control line on the building.

 

3.The adjustment of the elevation, axis and verticality deviation of the column are related to each other, and the correction work will be completed when all the standards are met.

 

 

Steel beam installation process

 

Unload the steel beams to the vicinity of each column, hoist them to the floor with a car, and then install them by mast cranes. The main beams with some heavy components can be platform craned with car cranes. The secondary beam can be installed with a self-made wheeled crane (5t). Starting from the third zone, the main girder, the secondary girder and then the purlin, the steel girder shall be hoisted by masts one by one according to the number. Only when the two ends of the girder are fastened with bolts (or spot welded firmly), the hooks can be loosened and the others are hoisted in sequence Steel beams. Weld after passing the inspection.
The lashing and hoisting points of steel beams are particularly important. Steel poles can be used when the steel beams are too long. There are many steel beams in this project with a maximum length of about 20m. A triangular hanging plate is used to enlarge the distance between the steel ropes to increase the angle of the steel ropes. Require. Schematic diagram of steel beam lashing.

 


Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
亚洲古典第一区| 成人露脸| 特大黄片精品| 嗯啊亚洲精品| 久久婷婷五月综合97色一本一本| 亚洲无码日韩精品第一页| 免费日韩AV| 久久香蕉蜜桃| 人妻无码中文字幕一区二区三区| 久久精品日韩| 美女少妇性爱会所| 精品国产_亚洲人成在线| 久久综合九色综合97欧美| 91精品无码一区二区| 久久人妻熟悉| 免费av在线一区二区三区| 无码潮喷中文字幕在线| 在线观看不卡AV| 人人人人人wwwse| 欧美性爱一区二区三区| 99国产欧美久久久精品蜜臀| 国产又粗又长| 开心激情丁香五月| 合集综合久久性色亚洲| 日本乱人伦精品免费观看| 午夜不卡黄色电影| re6热在线视频精品66| 日日摸夜夜添夜夜无码区| 86AV老司机| 青草社区视频| 久久亚洲日韩射精品| 91av不卡视频高清| 亚洲激情在线网| 男女喷水亚洲网站| 亚洲精品国产精品乱码不66| 成人试看120秒体验区| 中文字幕 无码 另类| 丨国产丨丝袜入口综合| 日韩欧美国产精品综合| 精品不卡一区二区国产| 邻居人妻三上悠亚|