欧美精品在线视频,中文字幕台湾亚洲,可以免费观看一级欧美啪啪,91n免费处女在线破视频+进https://www.fqesyc.

Language:CHINESESENGLISH

Home > News > Seven construction processes of steel structure workshop
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://szcxdj.com.cn

Seven construction processes of steel structure workshop

Time:[2021-11-13]  Hits:2335

The main process flow of steel structure plant construction is as follows:

1. Construction setting out. According to the design requirements and drawing requirements, use theodolite and level for positioning. After determining the axis and elevation, confirm the position of steel frame footing.

2. Foundation embedded parts. Before foundation concrete pouring, the embedded bolts shall be fixed according to the size, and the embedded bolts shall be wrapped in advance to avoid pollution during concrete pouring. After the completion of concrete pouring, the concrete residue at the embedded anchor rod and screw port shall be cleaned in time.

3. Steel column hoisting. First, confirm the position of component lifting points and take protective measures. After lifting the steel column, align it close to the anchor bolt, align the mounting hole with the bolt, and then slowly put down the hook. After initial calibration, tighten the bolts.

4. Steel beam installation. After the steel column is rechecked, the steel beam shall be lifted and bound symmetrically at two points. When the datum face of steel beam and steel column is on time, butt joint adjustment and correction shall be carried out, and then fixed and connected.

5. Purlin installation. The purlin generally adopts the method of one hook and multiple lifting. The error is adjusted by moving the sample bar back and forth along the purlin, tightening and loosening the bolts, and finally fixed with bolts for correction.

6. Install wallboard. Start at the gable at one end and move on to the other. At the initial stage of construction, the operation platform shall be used for transition to ensure that the top plate is parallel and installed vertically through stay wire. It is best to form at one time and handle it with care to avoid scratching.

7. Workshop painting. First remove the stains on the metal surface, and then apply antirust paint. After the antirust paint is dry, start puttying. After the putty is completely dry, it shall be polished and leveled. Finally, apply anti phosphating primer.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
精品人妻互换一区二区被强行| 91久久国产最好的精华液| 亚洲国产伦理论| 亚洲人人妻片| 国产又粗又猛又大又黄的视频| 国产爆乳精品一区二区在线观看| 精品久久久无码小嫩模| av中文字幕分类m男| 色五月综合小说| 亚洲性色网站| 丰满人妻大屁股一区二区三区| 女生自慰在线| 中文字幕制服丝袜无码网站 | 久久久国产乱子伦精品| 在线免费观看一区二区三区| 久久各类屁股视频| 国产亚洲精选| 国产亚洲精品午夜高清影院| 亚洲午夜中文字幕在线网| 巴西无码| 精新精新国产自在现拍视频| 人妻66| 亚洲午夜成人国产福利| 开心五亚洲| 免费激情麻豆啊啪啪| 99高清无码| 加勒比婷久热色道五月综合| 日韩精 在线播放| 免费看国产黄线在线观看| 人人九九精品国产| 亚洲天堂精品视频| 久久全国免费视频| 91无码视频在线观看| 亚洲人五月天| v综合v亚洲欧美国产| 超碰香蕉AV| 国产激情大臿免费视频| 亚洲色图日韩欧美| 精品一区二区无码性爱电影| 无码一区在线视频| 在线看国产成人精品网|