Floor boards

Floor boards

Floor decking steel sheet
Floor deck means pressed steel plate not only as a permanent template of concrete floor, but also as load-bearing bar at the bottom of the floor to participate in the stress calculation, to work together with concrete to form a composite floor slab. 

Performance of composite floor slab: Saving a lot of temporary template; Leaving out all or part of the template support; Cut concrete dosage; Lighten permanent load of the structure; Saving a lot of labor force in transport, storage and installation, which has more important significance in both high-rise buildings and seismic regions; Reducing the workload; Easy laying pipelines of communication, electric power and heating; Also easy laying of heat preservation, sound insulation, heat insulation and vibration isolation material; Improving the floor performance; full playing good steel's tensile strength and ductility and concrete's compressive strength and large stiffness. 
 

 

Name

Modle

Picture

Thickness(mm)

Moment of inertia cm3/m

Section of modulus cm3/m

Open-type  Floor Deck Sheet

YX70-200-600 

0.8

89.35

23.7

0.9

103.5

25.7

1.0

118.6

31.6

1.2

149.8

40.01

YX75-200-600 

Thickness(mm)

Moment of inertia cm3/m

Section of modulus cm3/m

0.6

60.38

16.42

0.8

76.57

20.31

1.0

100.64

27.37

1.2

128.19

35.96

YX75-293-880

Thickness(mm)

Moment of inertia cm3/m

Section of modulus cm3/m

0.7

102.3

23.481

0.9

122.8

29.52

1.2

164.4

40.464

1.5

205.5

50.313

YX76-344-688

Thickness(mm)

Moment of inertia cm3/m

Section of modulus cm3/m

0.8

91.62

23.46

1.0

119.38

30.61

1.2

142.01

38.98

1.4

167.34

43.90

1.5

178.70

46.80

YX51-253-760

Thickness(mm)

Moment of inertia cm3/m

Section of modulus cm3/m

0.8

53.80

19.30

1.0

67.30

24.20

1.2

80.80

29.20

YX51-240-720

Thickness(mm)

Moment of inertia cm3/m

Section of modulus cm3/m

0.8

47.52

17.9

0.9

53.8

20.1

1.0

58.1

22.9

1.2

68.7

28.4

YX51-304-914

Thickness(mm)

Moment of inertia cm3/m

Section of modulus cm3/m

0.8

106.6

24.46

1.0

127.9

30.76

1.2

171.3

42.15

1.5

214.1

52.41

Close Type Floor Decking Sheet

YX65-185-555

Thickness(mm)

Moment of inertia cm3/m

Section of modulus cm3/m

0.8

53.95

25.614

1

67.44

32.018

1.2

80.928

36.02

Dovetail Type Steel Floor Sheet

YX51-190-760

Thickness(mm)

Moment of inertia cm3/m

Section of modulus cm3/m

0.8

54.803

14.42

1.0

68.504

18.02

1.2

82.204

21.63

1.5

102.756

27.04

YX51-200-600 

 

Thickness(mm)

Moment of inertia cm3/m

Section of modulus cm3/m

0.8

54.803

14.42

1.0

68.504

18.02

1.2

82.204

21.63

1.5

102.756

27.04


Note: Matters needs attention in floor deck installation 
Column grid spacing generally is 5~9.0m*8~15m and steel structure beam spacing is 3m. Fabrication length of floor deck is 4.97~8.97m. Transport, ation and installation are more difficult, especially for floor deck with arc vertical hoisting. It is difficult to coat between the beams and narrow down, which also disrupts the second beam welding normal working procedure. Fabrication length is limited to 3~6m, which can avoid lifting problems of secondary girder in vertical transportation. When using special soft sling in hoisting, one should check whether the soft slings are torn or cut off. When floor deck is placed aside the steel beam, it should avoi, , , , d probe. When operating, personnel should wear seat belts and ensure that sides' parts are on the perimeter security line. Before using penetration welding spot in welding connection, one should prepare leftover material arc welding, adjust welding current adjustment. Because of no horizontal template and the vertical support plate at the bottom of the floor deck, material should not be too concentrated when watering the concrete. It adopts the planar vibrator and apportions vibrating in a timely manner.

Hits:10006 Time:[2024-11-23]

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
亚洲最新无码| 无码日韩字幕| 97人摸人人澡人人人超碰| 日本精品xxx| 四川毛片一級| 国产美女自卫慰久久亚洲| 国产日韩久久精品| 一区二区三区振动视频| 一本色道无码在线观看| 草极品少妇| 小蝌蚪久久精品国产| 人妻无码不卡中文字幕系列| 亚洲男人的天堂在线观看2020| 精品一区二区色呦呦| 91我不卡福利视频| 欧美性大战XXXXX久久| 99热思思在线观看| 日本性在线观看| 两级毛片免费| 潮喷视频成人无码| 欧美激情吞精一区二区| 亚洲色熟女图激情另类图区 | 日韩中文字幕欧美亚洲第一区| 日本网站一区精品| 特黄日逼欧美| 久久e九九免费视频| 国产欧美日韩图片一区二区| 日韩AV无码免费一区二区| 欧美精品肥臀久久久| 中文字幕精品人妻一区二区三区| 日本阿v国产| 国产初高中精品无码专区| 国精品丰满熟女一区二区| 少妇AV无码网址| 日韩国产www| 天堂а√在线最新版中文在线| 亚洲av肉| 国产女人人人看人人拍视频| 在线12萝自慰喷水| 亚洲免费日韩无码系列| 偷拍电影91视频|